TURLOCK, Calif. — November 17, 2026. Motorists crossing Turlock should anticipate continued lane restrictions on Geer Road and road closures on East Marshall Street, according to the city's official construction notice updated November 16 at 8:40 p.m.
Geer Road restrictions
On Geer Road between Golden State Boulevard and East Hawkeye Avenue, the city's notice lists inside-lane closures in both directions for median improvements and road reconstruction through January 8, 2027. The inside lanes between Golden State Boulevard and Wayside Drive carry the same January 8 end date, with local access only. A separate Geer segment between Hedstrom Road and Sai Lane lists restrictions through December 4, 2026.
East Marshall Street closures
The city also lists a closure on East Marshall Street between North Berkeley Avenue and North Johnson Road from November 16 to December 4, with local and emergency access only. Other East Marshall segments, between Colorado Avenue and North Berkeley Avenue and between Colorado and Bell Street, have posted daytime closures through November 17, subject to updated notices.
What drivers should do
The reported dates are municipal schedules, not a guarantee every restriction is active at every moment. Construction, weather and traffic management can alter conditions. Drivers should follow posted signs, allow extra travel time and avoid using residential streets as unauthorized detours.
For current conditions, Turlock publishes a road closures page and sign-up for municipal road alerts; the Engineering Division can be reached at 209-668-5520. A prior October water-valve project on Geer Road has a separate history and should not be confused with these ongoing median and roadway improvements.
Source: City of Turlock official Road Closures & Major Delays, updated November 16, 2026.
Featured image: illustrative road work sign by Zac Gudakov / Unsplash, not an actual Turlock closure sign.
Support Turlock News
Choose how to support Turlock News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Turlock News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Turlock News
- Turlock Columbia Pool Ventilation and Gas-Line Work Draws $62,235 Low Bid →
- Turlock Transit Area Paving Draws $120,740 Low Bid, Well Below $233,000 Estimate →
- Turlock Water Main Project Gets $960,000 Low Bid for South Center Street and Crane Avenue →
- Turlock Wastewater Plant Draws $15.70 Million Low Bid for Primary Flotator Overhaul →
- Turlock Council District 3 Still Undecided: Ryan Taylor Leads Cassandra Abram by Just 22 Votes →

СООБЩЕСТВО
Комментарии
Присоединяйтесь к обсуждению California58. Чтобы комментировать, необходимо войти в аккаунт.
Создайте бесплатный аккаунт California58 или войдите через доступную социальную сеть.