TURLOCK, Stanislaus County — November 4, 2026. Incumbent Turlock Mayor Amy Bublak is ahead in a competitive three-candidate mayoral election, but a large number of ballots remain to be processed.
Reported preliminary results
In The Modesto Focus’s November 4 morning report, Bublak had about 48%, Jim Reape 42.6% and Kelley Coelho about 9%. The percentages are rounded and refer only to that published snapshot.
Why the contest matters
The mayor’s office is separate from the City Council District 1 and District 3 elections. A 5.4-percentage-point gap at this reporting stage cannot be presented as a certified winner. Later county returns could change the proportions.
What happens next?
This report uses figures published by local journalists in an updated November 4 morning election review and is not a newly verified November 5 tally. Stanislaus County must complete its post-election canvass, including eligible mailed and provisional ballots. An election-night lead is unofficial until certified by election officials. Readers should check the registrar’s latest count before treating any candidate as elected.
Sources: The Modesto Focus — local election results updated November 4; Stanislaus County Registrar of Voters. Statewide context: California58 election hub.
Support Turlock News
Choose how to support Turlock News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Turlock News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Turlock News
- Turlock Columbia Pool Ventilation and Gas-Line Work Draws $62,235 Low Bid →
- Turlock Geer Road Lane Closures Expected Into January as East Marshall Street Work Continues →
- Turlock Transit Area Paving Draws $120,740 Low Bid, Well Below $233,000 Estimate →
- Turlock Water Main Project Gets $960,000 Low Bid for South Center Street and Crane Avenue →
- Turlock Wastewater Plant Draws $15.70 Million Low Bid for Primary Flotator Overhaul →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.