TURLOCK, Stanislaus County — October 23, 2026. The City of Turlock has published information relevant to residents and local businesses. California58 reviewed the city’s materials and distinguishes event schedules and proposed work from confirmed final outcomes.
Where is the project?
Turlock’s capital projects register identifies City Project 25-063, a replacement of existing gate valves of several sizes on Geer Road between Wayside Drive and Hedstrom Road. The plan calls for removing or replacing water-control hardware and related installation work. The project is a utility maintenance task, not a complete replacement of every water pipe in Turlock.
What was the published construction schedule?
The city posted an expected start of August 17, 2026 and estimated completion around October 2, with R&R Paving Inc. named as contractor. October 2 has already passed. Without a dated final acceptance or recent completion notice, the estimated date should not be reported as proof all work is finished.
What did the city say about access?
Its construction description warns of temporary lane tapers and work that may affect access in the broader utility works area, while indicating efforts to preserve resident and service vehicle access. Travelers should obey actual construction signage, and customers should verify any water shutoff with the utility before storing water or cancelling travel.
How to check current status
Ask Turlock Public Works or the capital-project contact for the actual completion notice, any remaining surface restoration and whether valves have passed acceptance testing. The city’s project register and eProcurement documents can help distinguish a contract date from completed field work.
Primary source: City of Turlock official publication. Read Turlock News and browse the statewide local newspaper directory. Organizations seeking a dedicated organization page or mini website may enquire separately from our news coverage. Send sourced corrections to California58 Newsroom. Support independent local journalism.
Support Turlock News
Choose how to support Turlock News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Turlock News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Turlock News
- Turlock on a 2026 Trucking Documentary: a university city on the northbound CA99 route →
- Turlock Columbia Pool Ventilation and Gas-Line Work Draws $62,235 Low Bid →
- Turlock Geer Road Lane Closures Expected Into January as East Marshall Street Work Continues →
- Turlock Transit Area Paving Draws $120,740 Low Bid, Well Below $233,000 Estimate →
- Turlock Water Main Project Gets $960,000 Low Bid for South Center Street and Crane Avenue →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.